  • We added a Single Line Diagram (SLD) app to the Platform. This app is integrated into the installation workflow where it:
    • dynamically generates an SLD for solar systems with up to 8 strings and for DC-coupled solar and battery systems.
    • presents the SLD in the Override SLD task, where if required, it can be downloaded as a PDF and then uploaded and edited in the drawing tool, draw.io.
  • We added two user tasks to the Installation workflow:
    • In Assign installation job to installer and app, the operator can select the Installer company to complete the Installation and specify whether it will be conducted through the app.
    • In Set installation date, a task for off-app jobs only, the Operator can select the Job date to schedule the Job.

Improved

  • We moved the Miscellaneous hardware SKU sub-category from the Installation SKU category to the Hardware category. This ensures that miscellaneous hardware SKUs are included in the Order Bill of Materials.
  • We updated the branding for two Installation job artefacts - the Job info sheet and the Bill of materials.
  • We updated the Installation workflow so that once the Job status is Scheduled:
    • Procurement tasks are shown
    • STC tasks are shown four days before the job date.
  • We removed the Job pack file as it was redundant. All Job files are available on the Job record and automatically synced to the Installer app for on-app Jobs.

Fixed

  • To fix a problem where percentage margins were not calculated correctly, we updated the Service fee calculation to account for miscellaneous SKU items and all variations.
  • We fixed an issue where GST was not added to miscellaneous SKU items while a Quote was being created.
  • We fixed an issue where Job record files and in-app statuses were not in sync.
  • We fixed an issue where a NSW customer looking to start an order for a battery-only system could not progress to the payment page.